Date: Saturday 4/26
Work: We've got plenty of work to do, inside and out, including replacing front porch railings, repairing drywall, and installing backsplash in the kitchen, building a platform for the dehumidifier, pouring concrete for the front walkway, etc.
Location(s): Womens Care Center — Fullerton